IQ Buildings | Hybrid heating system engine room
16692
portfolio_page-template-default,single,single-portfolio_page,postid-16692,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-10.1.2,wpb-js-composer js-comp-ver-5.1,vc_responsive
 

Hybrid heating system engine room

Date

Hybrid heating system engine room

Construction of an automation system for controlling a hybrid heating system consisting of low temperature Hydrobox and an oil boiler as an auxiliary heating source.

The Hydrobox is interconnected to a Heat Recovery VRF system, which the indoor units use to cool the premises.

Tasks set by the client in the project:

Management of:

  • Indoor VRF air conditioners via KNX protocol.
  • Hydrobox VRF indoor unit via KNX protocol.
  • Oil boiler via Loxone MiniServer.
  • Solar water kit for Domestic Hot Water via Loxone MiniServer.
  • Open pool heating via Loxone MiniServer.
  • Pump station via Loxone MiniServer.
  • Visualisation through Loxone MiniServer.

Χρησιμοποιούμε cookies για να σας προσφέρουμε την καλύτερη εμπειρία στο διαδίκτυο. Συμφωνώντας αποδεχτείτε τη χρήση των cookies σύμφωνα με την πολιτική cookie.