IQ Buildings | Automation system upgrade
16695
portfolio_page-template-default,single,single-portfolio_page,postid-16695,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-10.1.2,wpb-js-composer js-comp-ver-5.1,vc_responsive
 

Automation system upgrade

Date

Automation system upgrade

The purpose of the project was to replace the old HVAC controller and to upgrade the automation system by installing a new DDC controller in a home engine room while  integrating it with the already installed KNX system according to customer requirements.

The application includes a 4-pipe heating system – air conditioning with Domestic Hot Water and pool heating.

Tasks set by the client for the project:

  • LPG boiler
  • Air- water Chiller
  • Domestic Hot Water Tank
  • 4-Pipes Air Handling Unit
  • Under Floor Heat
  • Heating and ceiling cooling
  • Cooling mode with Fan Coil Room
  • Pool heating
  • Control – Equipment Management, with Integration Home Automation (KNX) via Loxone MiniServer + Modbus I / O Extensions.

Χρησιμοποιούμε cookies για να σας προσφέρουμε την καλύτερη εμπειρία στο διαδίκτυο. Συμφωνώντας αποδεχτείτε τη χρήση των cookies σύμφωνα με την πολιτική cookie.